電動卷閘門有很多種。如何選擇適合自己的?1.測量彈線:根據設計位置復核洞口尺寸,確定地坪和吊頂標高線;彈出導軌的安裝位置線;彈出傳動支架的垂直線和卷筒體的中心線。同時,拆除影響安裝的角鋼和槽鋼。參見卷簾門安裝順序圖的第一步。2.導槽角鋼1安裝:參照卷簾門安裝順序圖。第二步。調整垂直度。3.安裝左右支架板、電機板、電機和鏈條。參見卷簾門安裝順序圖第三步。安裝鏈條和驅動部件, which must be fastened with fasteners without looseness. 4. Installation of the reel: refer to the installation sequence diagram of the rolling shutter door. Step 4: Install the reel, adjust the level, and tighten the screws to ensure that the reel is vertical to the support plate. 5. Installation of electronic control system: First, you should be familiar with and master the electrical schematic diagram, and then install it according to the Product Manual. 6. No-load test run: After the transmission system and electrical control system are installed, but before the curtain board is installed, the wiring should be connected for no-load test run. The drum must rotate flexibly. 7. Installation of the curtain board: firstly, cut off the curtain board packaging tape (Figure 3), tear off the protective film, put the front and back seats of the curtain board in place (refer to the installation sequence diagram of the shutter door), 用兩根35m長的繩子,用繩子活結把整個百葉板的兩端系好(圖4),把繩子繞在轉軸上(圖5),用兩個人把繩子的另一端拉緊(圖6)。(注意旋轉電機前應先松開電機限位調節螺栓),然后用兩根15m長的繩子分別系住整個卷簾和轉軸兩端(如圖8)。松開并解開兩根35米長的繩子,拉動第一個多孔窗簾逐漸轉動電機,使窗簾逐漸拉起,直到第一個多孔窗簾能對準轉軸上的螺栓孔,然后將窗簾固定在轉軸上。 然后轉動馬達把所有的窗簾都卷起來。調整電機極限。注意:整個百葉窗下嚴禁站人。8.導軌安裝:卷簾門安裝順序圖第六步:用 請調整上方第二塊簾片的左右位置,確??癸L鉤鉤住導軌上的方鋼。9.盒蓋安裝:參照卷簾門安裝順序圖第7步。圓弧盒蓋的兩端用鉚釘固定在支架板的扁鋼上。10.調節卷簾門的限位:參照電動卷簾門機的說明書,調節限位開關,使卷簾門簾的上下限處于合適的位置。11.接線調試:首先通過拉鏈條手動試運行,然后用電機多次開關卷簾門,進行相應調整,直至開關無卡澀、堵塞、異響等缺陷。
電動卷閘門1的特點。門體造型新穎美觀,結構靈活緊湊,占用空間小,廣泛應用于建筑物的內外門上。2.門體采用電動驅動,輕巧靈活,上下行程由限位開關自動控制,操作方便。停電時可以手動操作。3.門的種類很多,其中全封閉的門密封性能好,可以防風、防塵、保溫、防腐。經過特殊處理后,門體還可以具有防火功能。4.卷門機結構先進,功能齊全,有過熱保護裝置,能保護電機在高溫過載時不受損壞。5.可安裝遙控器,使電動卷閘門遠程開關。
長沙卷簾門,卷簾門,尋找新明行,廠家,定做各種款式,產品用料上乘,外觀設計美觀,款式新穎,安全可靠,噪音低,降低安全性,做工精細,歡迎來電咨詢。